Custom Engineered Shannon Thermal Blanket Systems

Our custom engineered and fabricated thermal blanket insulation systems are designed, manufactured, installed, and warrantied to improve the insulation performance of your existing steam system. They dramatically increase steam system efficiency resulting in significant energy and financial savings to the customer. We identify the valves and fittings where traditional insulation cannot be used. Each blanket is CAD designed and custom fabricated for a perfect fit to match Gate Valves, Pressure Reducing Flanges, Strainers, Stream Traps, Heat Exchanger Heads, Boiler Heads, PRV Stations, Condensate Pumps, and similar equipment.

 

Along with the benefit of immediate energy savings, the blankets are designed for quick removal and quick reinstallation. Problem insulation areas can now be addressed with a highly functional insulation system. Also, there is the added benefit of the lowering of ambient temperatures in mechanical rooms, tunnels, manholes, and the general work environment.
FITTING ​INSULTECH® THERMAL BLANKETS

Custom Engineered Shannon Thermal Blanket Systems

Our custom engineered and fabricated thermal blanket insulation systems are designed, manufactured, installed, and warrantied to improve the insulation performance of your existing steam system. They dramatically increase steam system efficiency resulting in significant energy and financial savings to the customer. We identify the valves and fittings where traditional insulation cannot be used. Each blanket is CAD designed and custom fabricated for a perfect fit to match Gate Valves, Pressure Reducing Flanges, Strainers, Stream Traps, Heat Exchanger Heads, Boiler Heads, PRV Stations, Condensate Pumps, and similar equipment.
Along with the benefit of immediate energy savings, the blankets are designed for quick removal and quick reinstallation. Problem insulation areas can now be addressed with a highly functional insulation system. Also, there is the added benefit of the lowering of ambient temperatures in mechanical rooms, tunnels, manholes, and the general work environment.
Learn more >

Utility Incentives

Many of the natural gas utility companies around the country have programs that offer financial incentives for energy efficiency projects. As part of our overall value offer to the customer, Shannon Energy Resources maximizes the available dollars available to help offset the total project cost. We not only handle the application and qualification process, along with any required measurement and verification, we also take financial responsibility for collecting the incentives. The incentive amount is deducted from the total project cost and the customer is required to only make monthly installment payments on the net balance of the project.
Cash Flow options

Utility Incentives

Many of the natural gas utility companies around the country have programs that offer financial incentives for energy efficiency projects. As part of our overall value offer to the customer, Shannon Energy Resources maximizes the available dollars available to help offset the total project cost. We not only handle the application and qualification process, along with any required measurement and verification, we also take financial responsibility for collecting the incentives. The incentive amount is deducted from the total project cost and the customer is required to only make monthly installment payments on the net balance of the project.

No Out of Pocket Expensive

We enable our customers to enjoy a new, custom insulation system, and begin saving energy and money without any upfront costs. Projects are paid through pre-set monthly installment plans designed around calculated energy savings. This puts the customer in a cash flow neutral scenario during the project payback period.

Learn more >

No Out of Pocket Expense

We enable our customers to enjoy a new, custom insulation system, and begin saving energy and money without any upfront costs. Projects are paid through pre-set monthly installment plans designed around calculated energy savings. This puts the customer in a cash flow neutral scenario during the project payback period.

“We are so excited to get this project installed; the quality of the product is really amazing. We will be saving around $45,000 per year on natural gas by installing the Shannon system. Payback is on track to happen in just under a year.”

Clem Beaulieu, Director of Facilities Operations, St. Anne’s Steward Hospital, Fall River, MA

Get Started