Summary

Energy Resources was able to implement the following measures leveraging incentive funding:
  • Turnkey Installation of High Efficiency Dust Collection system
  • Air Compressor
  • Thermal jacket insulation on steam loop
  • Hot Room Damper Controls & Steam Trap Repairs

Turnkey Benefits

Kerite

  • Total Project Cost
    $958,852
  • Eversource Incentive
    $591,857
  • Annual kWh Savings
    453,694
  • Annual MMbtu Saving
    s9,109
  • Annual Cost Savings
    $161,621.85
  • Payback Period
    2.27 Years
  • Carbon Reduction
    804 Metric Tons of CO2e
  • Project done in partnership
    Marmon Utility